High Frequency Three Phase Online UPS
33XG10-40KVA
KEY FEATURES
- LCD High Frequency Double Conversion Sine Wave Online UPS 10-40KVA
- DSP digital control technology, Zero transfer time
- Three phase sine wave, output Power Factor 0.9
- Wide input voltage range 274-478V
- Wide input Frequency 40-60Hz(50Hz)/50-70Hz(60Hz) , support Generator, output HZ be fixed or follow mains
- Advanced Input PFC technology, 0.99
- Full protection, overload, over voltage, short circuit, over temperature etc.
- Adaptive Load Management
- Generator compatible
- RS232 communication with monitoring software, optional
- EPO, SNMP optional, PRC10-40K Option
Technical Specifications
Model |
33XG10KS |
33XG10K |
33XG20KS |
33XG20K |
33XG30KS |
33XG40KS |
Capacity |
10KVA/9KW |
20KVA/18KW |
30KVA/27KW |
40KVA/36KW |
Input |
Voltage |
3PH+N+G, 380V |
Voltage Range |
(274-478) VAC (Full load) |
Breaker |
32A |
50A |
60A |
80A |
Frequency |
40~60Hz (50Hz ) /50~70Hz (60Hz) |
Factor |
> 0.99 |
Output |
Voltage |
Ph to N, 220V200/208/220/230/240VAC (1±1%),adjusted by software.
10% derating for 208VAC/200VAC. |
Current |
15A |
30A |
45A |
61A |
Factor |
0.9 |
Frequency |
Line Mode (1) synchronized 46~ 54Hz; |
Line Mode (2) 50Hz (line 40~ 46 or 54~ 60Hz); |
Bat mode: 50Hz. ( 60HZ for Choice ) |
Distortion |
THD < 3% (R full load) |
Overload Capacity |
105% - 125% transfers to bypass mode after 1 minutes;
125% ± 5%< load ≤ 150% ± 5% transfers to bypass mode after 30 second |
Current Crest Ratio |
3:1 |
Efficiency |
Line: ≥ 93%, Bat: ≥ 90% |
Communication |
RS232 with softwave and Canble. SNMP Optoion |
Rated Bat No. |
192(240)VDC |
16(20)*7Ah |
192(240)VDC |
16(20)*7Ah |
±192(240)VDC |
Charge Current |
5A |
1A |
7.5A |
1A |
10A |
10A |
ECO/EPO |
Optional |
Short Circuit Protection |
YES |
Working Temperature |
0ºC~40ºC |
Altitude |
<1000m |
Audible Noise |
≤60dB |
Storage Temperature |
-15ºC~45ºC |
Work Humidity |
20%~95% |
Noise (dB) |
≤ 60dB |
Dimension(L*W*H) mm |
533x260x501 |
717x260x710 |
Weight (kg) |
26 |
83.5 |
50 |
98 |
58.5 |
60 |
PRODUCT DISPLAY
10-40KVA BACK VIEW
1. EPO Emergency shutdown switch
2. SNMP card
3. Parallel board install position
4. RS232 communication interface
5. FAN
6. RJ45
7. Input breaker
8. Battery connect position
9. Wiring installation
10. Terminal block
11. Wheel